Charlotte County, FL Logo

941.743.1200
18500 Murdock Circle
Port Charlotte, FL 33948

Mobile Menu close icon
close search

Project Status Updates

Public Works Ian Projects

Hurricane Ian Projects

Learn about the ongoing Public Works and Facilities repair projects to county roads, right of ways and facilities from damage caused by Hurricane Ian.

Cleveland Avenue Sidewalk

Cleveland Avenue Sidewalk Sales Tax Project

Last Updated: 05/07/2024 Category: Sales Tax Funded Category: Sidewalks Current Phase: Design Development

The BCC has requested a sidewalk be designed and constructed on Cleveland as part of the 2020 Sales Tax Extension.

Read More

2023 Annual Paving Program News Image

2023 Annual Paving Program Sales Tax Project

Last Updated: 05/07/2024 Category: Roadway Current Phase: Construction

The purpose of this project is to resurface Charlotte County roadways in the following districts: Greater Port Charlotte, Pirate Harbor, Woodland Estates, Road and Bridge.

Read More

Flamingo/Edgewater Widening News Image

Flamingo/Edgewater Widening Sales Tax Project

Last Updated: 05/07/2024 Category: Roadway Current Phase: Planning and Project Approval

Flamingo/Edgewater Widening

Read More

Babcock Ranch CCSO District 5 Office News Image

Babcock Ranch CCSO District 5 Office

Last Updated: 05/03/2024 Category: County Facilities Current Phase: Construction

The 12,000 square foot building shell has been completed by Kitson Partners of Babcock Ranch in partnership with Florida Premier Contractors. The interior work has started.

Read More

Babcock Ranch Fire Station 9  News Image

Babcock Ranch Fire Station 9

Last Updated: 05/03/2024 Category: County Facilities Current Phase: Construction

This 12,000 square foot three-bay facility will be a state-of-the art with hurricane impact rated bi-fold doors for additional protection. Interior build-out has started.

Read More

Englewood East/Gulf Cove MSBU's Bridge Rehabilitations - #014082 and #014088

Englewood East/Gulf Cove MSBU's Bridge Rehabilitations - #014082 and #014088

Last Updated: 05/03/2024 Category: Bridges Current Phase: Construction

Englewood East/Gulf Cove MSBU's Bridge Rehabilitations Design Services- Bridges 014082 and 014088

Read More

Sheriff District 4 HQ, Training Facility and K9 Unit News Image

Sheriff District 4 HQ, Training Facility and K9 Unit Sales Tax Project

Last Updated: 05/03/2024 Category: County Facilities Category: Sales Tax Funded Current Phase: Construction

Construction of a replacement District 4 Headquarters Facility with a training component and K9 kennel/training area replacing existing facilites. The district office will utilize the prototype layout from District 1. The training building area will be incorporated into a single facility. The facility will be constructed at the Airport Road Annex site, replacing the existing Sheriff's Training, Supervisor of Election and old Transit Facility .

Read More

Family Services Center - Phase 2 News Image

Family Services Center - Phase 2 Sales Tax Project

Last Updated: 05/03/2024 Category: Sales Tax Funded Category: County Facilities Current Phase: Turnover and Closeout

Completed the Human Services integrated services model with Phase 2 following the completion of Phase 1. Phase 2 enabled youth services to be constructed as a separate building on the campus. In Phase 2 of the FSC project, the Human Services' staff offices were constructed along with critical shared support facilities, maker space, and expanded services. 
 

Read More

Ainger Creek Boat Ramp Replacement News Image

Ainger Creek Boat Ramp Replacement

Last Updated: 05/03/2024 Category: Parks And Recreation Current Phase: Design Development

This project consists of evaluating the site to improve traffic flow and to maximize parking, determining the best location for possible construction of a permanent restroom facility, and evaluating the current ramp to minimize buffering time for loading and unloading vessels.

Read More

Delivering Exceptional Service

Questions? Issues?

Contact Us